What has been achieved so far?

For a review of the project activity undertaken from 2018 to date please view the Greenstreams Newsletters on the Issuu app by clicking on the titles below:

January 2019

March 2020 (includes a map of the proposed 3 Valleys Nature Park

Below is alist of achievements as at the close of 2019:

Access improvements

  • Lockwood Greenway: 1km cycle route alongside the River Holme.
  • 5 km of new public access along the River Colne.
  • Upgraded footpaths along 1 km of existing footpaths.

Recreation and Amenity

  • Numerous viewing and seating areas along the river.
  • Canoe access and launch on Lower Colne.
  • Easier access to the river for walking, angling, canoeing and birdwatching.
  • A network of adopted sites maintained to make them safer and more attractive to users.

Biodiversity projects

  • Managing the Birkby-Bradley Greenway for wildlife.
  • Creation of the Bat Tower and bat habitats in the Colne Valley.
  • A major woodland restructuring project in the Lower Colne Valley.
  • Develop an ARK site for the native white-clawed crayfish.
  • Helped develop the Hey Green Wildlife Site, Newsome. 
  • Work with numerous groups to help them manage important biodiversity sites.
  • Various smaller tree planting projects.
  • Feasibility study to improve fish passage up the river.
  • As part of the Big Tree Plant we have also planted 7000 trees in the Dewsbury and Batley areas including 100 fruit trees along the Spen Valley Greenway.

Trail guides: we have produced a number of these - see publicity

Dean Wood & Beaumont Park Circular

Click here to download

Five Reservoir Circular

Click here to download

Longwood Valley Circular

Click here to download

Riverside Rambles

Click here to download

Tunnel End Circular

Click here to download

Milnsbridge Heritage Trail

Click here to download

River Stewardship

Click here to download